Flexible placement

Small footprint

Easy to install

Floor stand

Floor stand Shunt unit Pipe design Installation 20 25 32 40 50
1 Shuntopac 20-40 Komp All Horizontal ✔ ✔ ✔ ✔
11 Shuntopac 20-40 Komp All Vertical 1 ✔ ✔ ✔ ✔
2 Shuntopac 20-50 V 01, 01N, 02, 02N, 05B, 05F, 06B, 06F, 09 and 10 Horizontal ✔ ✔ ✔ ✔
21 Shuntopac 20-50 V 01, 01N, 02, 02N, 05B, 05F, 06B, 06F, 09 and 10 Vertical 1 ✔ ✔ ✔ ✔
3 Shuntopac 20-50 K 01K, 02K, 09K and 10K Horizontal ✔ ✔ ✔ ✔
31 Shuntopac 20-50 K 01K, 02K, 09K and 10K Vertical 1 ✔ ✔ ✔ ✔
32 Shuntopac 20-50 K 01K, 02K, 09K and 10K Vertical 2 ✔ ✔ ✔ ✔
4 Shuntopac 20-50 V 01, 01N, 02, 02N, 05B, 05F, 06B, 06F, 09 and 10 Horizontal ✔
41 Shuntopac 20-50 V 01, 01N, 02, 02N, 05B, 05F, 06B, 06F, 05SABO, 06SABO, 09 and 10 Vertical 1 ✔
5 Shuntopac 20-50 K 01K, 02K, 09K and 10K Horizontal ✔
51 Shuntopac 20-50 K 01K, 02K, 09K and 10K Vertical 1 ✔
52 Shuntopac 20-50 K 01K, 02K, 09K and 10K Vertical 2 ✔
61 Shuntopac 20-50 VÅ 01VÅ, 02VÅ Vertical 1 ✔ ✔ ✔ ✔
62 Shuntopac 20-50 VÅ 01VÅ, 02VÅ Vertical 2 ✔ ✔ ✔ ✔
71 Shuntopac 20-50 VÅ 01VÅ, 02VÅ Vertical 1 ✔
72 Shuntopac 20-50 VÅ 01VÅ, 02VÅ Vertical 2 ✔
8 Shuntopac U 20-50 All Horizontal ✔ ✔ ✔ ✔
9 Shuntopac U 20-50 All Horizontal ✔
Slide

Simonsland in Borås

When Kanico created a new district in the town of Borås, they chose TTM to supply shunt units for the HVAC systems. The area is called Simonsland and contains 60,000 m2 of buildings.

Slide

TTM Energiprodukter was one of the suppliers in the construction of the prestigious Copenhagen Opera House Together with their reseller, the company succeeded in winning the deal and delivering 98 different shunt units.

Slide

NCC are building their new head office at Järva Krog in Solna. The new head office has a strategic and easily accessible position adjacent to the E4 motorway.