Welcome to read about our case studies. Click on the links below to get a description of the objects.

Slide

When all parties have confidence in each other and trust that plans and promises made will be adhered to, even the most demanding time schedules and logistics plans will work out.

Slide
The opera house in Copenhagen

TTM Energiprodukter was one of the suppliers in the construction of the prestigious Copenhagen Opera House Together with their reseller, the company succeeded in winning the deal and delivering 98 different shunt units.

Slide
New office in Solna

NCC are building their new head office at Järva Krog in Solna. The new head office has a strategic and easily accessible position adjacent to the E4 motorway.

Slide
Arrhenius laboratory

NCC bouwt zijn nieuwe hoofdkantoor op Järva Krog in Solna. Het nieuwe hoofdkantoor zal strategisch gelegen zijn op een gemakkelijk bereikbare locatie dicht bij de E4-snelweg.

Slide
Complete substation Belarus

When TTM Energiprodukter received an inquiry about building a complete substation, the company wasn’t faced by a new problem

Slide
The Max IV laboratory

Synchrotron light is delivered quickly and precisely
– and so are shunt units from TTM!

Slide

The Friends Arena contains kilometres of pipes for heating and cooling systems, with 37 shunt units to control the climate and indoor environment.

Slide

When there’s a need to control temperature and flow to a snowmelt system for the whole of Huddinge Centrum, what’s required is a shunt unit of considerable size.

Slide

TTM Energiprodukter could offer a modern solution based on shunt units with dynamic FlowCon control valves

Slide

The HSB housing cooperative Brf Bryggaren in Eslöv had problems with gases in the system fluid in its heating pipes.

Slide

After a renovation involving pipe replacement, Botkyrkabyggen had recurring problems with cold apartments..

Slide

After a renovation involving pipe replacement, Botkyrkabyggen had recurring problems with cold apartments.

Slide

Energy metering with Shuntopac EM in an energy classified green building.

Slide
Simonsland in Borås

When Kanico created a new district in the town of Borås, they chose TTM to supply shunt units for the HVAC systems. The area is called Simonsland and contains 60,000 m2 of buildings.