Slide

Case studies - Fluid treatment

Welcome to read about our case studies. Click on the links below to get a description of the objects.

Slide

NCC bouwt zijn nieuwe hoofdkantoor op Järva Krog in Solna. Het nieuwe hoofdkantoor zal strategisch gelegen zijn op een gemakkelijk bereikbare locatie dicht bij de E4-snelweg.

Slide

The Friends Arena contains kilometres of pipes for heating and cooling systems, with 37 shunt units to control the climate and indoor environment.

Slide

When there’s a need to control temperature and flow to a snowmelt system for the whole of Huddinge Centrum, what’s required is a shunt unit of considerable size.

Slide

The HSB housing cooperative Brf Bryggaren in Eslöv had problems with gases in the system fluid in its heating pipes.

Slide

After a renovation involving pipe replacement, Botkyrkabyggen had recurring problems with cold apartments..

Slide

After a renovation involving pipe replacement, Botkyrkabyggen had recurring problems with cold apartments.

Slide
Simonsland in Borås

When Kanico created a new district in the town of Borås, they chose TTM to supply shunt units for the HVAC systems. The area is called Simonsland and contains 60,000 m2 of buildings.