Slide

Case studies - Shunt units

Welcome to read about our case studies. Click on the links below to get a description of the objects.

Slide

The ProfilHotels Nacka project illustrates the importance of close collaboration and strong commitment in turning tough challenges into success factors on a large and demanding project.

Slide

TTM Energiprodukter was one of the suppliers in the construction of the prestigious Copenhagen Opera House Together with their reseller, the company succeeded in winning the deal and delivering 98 different shunt units.

Slide

NCC are building their new head office at Järva Krog in Solna. The new head office has a strategic and easily accessible position adjacent to the E4 motorway.

Slide

NCC is building its new headquarters at Järva Krog in Solna. The new headquarters will be strategically located in an easily accessible location close to the E4 motorway.

Slide

When TTM Energiprodukter received an inquiry about building a complete substation, the company wasn’t faced by a new problem

Slide
The Max IV laboratory

Synchrotron light is delivered quickly and precisely
– and so are shunt units from TTM!

Slide

The Friends Arena contains kilometres of pipes for heating and cooling systems, with 37 shunt units to control the climate and indoor environment.

Slide

When there’s a need to control temperature and flow to a snowmelt system for the whole of Huddinge Centrum, what’s required is a shunt unit of considerable size.

Slide

TTM Energiprodukter could offer a modern solution based on shunt units with dynamic FlowCon control valves

Slide

Energy metering with Shuntopac EM in an energy classified green building.

Slide

Simonsland in Borås

When Kanico created a new district in the town of Borås, they chose TTM to supply shunt units for the HVAC systems. The area is called Simonsland and contains 60,000 m2 of buildings.