For large mixing volumes
Three sizes 200, 300 and 500 litres
Complete for delivery
TTM Offset 600
Home » Fluid treatment » Equalizing vessel » TTM Offset 600
TTM Offset 600
Equalisation vessel
TTM Offset is an equalisation vessel intended for use together with TTM NoXygen® vacuum degasser in heating, cooling and recovery systems that are sensitive to pressure variations, such as systems with pump expansion.
TTM Offset prevents the system’s pump expansion system from creating noise in the property. At the same time, TTM Offset increases the pump expansion system’s lifespan, because pressure variations are minimised.
TTM Offset is equipped with a control valve on the supply line. The control valve sets the correct pre-charge pressure. By closing the vessel to the system pressure and opening it to the atmosphere, the pre-charge pressure can easily be adjusted. TTM Offset should have a pre-charge pressure of approx. 70-80% of the system pressure for optimal operation.
Read more about:
Documentation:
Description: | Specification: |
---|---|
Model: | TTM Offset 600 |
Article number: | 518853 |
Volume: | 60 litres |
Diameter x height: | Ø 380 x 860 mm |
Pre-pressure: | 2,5 bar |
Max working pressure: | PN10 |
Media temperatur: | 0 – +90 °C |
Connection (internal): | DN25 |
Weight: | 12 kg |
Permitted liquids: | Water Glycol max 30% |
Material: Tank: Inner flange: Outer flange: Bladder: | Steel sheet Stainless steel Electro-galvanized steel Butyl |
TTM Connection hose
The TTM Connection hose is a Butyl hose with stainless steel braiding and internally-threaded connections classified for pressures up to 10 bar.
Simonsland in Borås
When Kanico created a new district in the town of Borås, they chose TTM to supply shunt units for the HVAC systems. The area is called Simonsland and contains 60,000 m2 of buildings.
TTM Energiprodukter was one of the suppliers in the construction of the prestigious Copenhagen Opera House Together with their reseller, the company succeeded in winning the deal and delivering 98 different shunt units.
NCC are building their new head office at Järva Krog in Solna. The new head office has a strategic and easily accessible position adjacent to the E4 motorway.